Vlog #14

Vlog 14 is now covering the terminal strips, securing the spade connectors and setting the pressure switch for the fuel pumps.

It was a frustrating time as now the aircraft is just a huge logistical issue with parts to complete the tasks being the central issue or the lack of, combined with long deliveries. Several tasks still need to be finished for this reason, and I am trying to have complete systems at this time, so it is frustrating.

Leaving for a holiday but back to the electric string on my return