Tuesday, 28 February 2023

Vlog #15

I returned to the hangar for a week and did more wiring behind the panel and engine. The loom for all the engine senders is now prepared and ready to install into the airframe. One of the biggest delays is waiting for a shipment of parts from the US, which I have just released.


I will be back up next week for four days with a bag full of parts to be installed. Vlog 15 is now up.



l

Thursday, 12 January 2023

Vlog #14

Vlog 14 is now covering the terminal strips, securing the spade connectors and setting the pressure switch for the fuel pumps.

It was a frustrating time as now the aircraft is just a huge logistical issue with parts to complete the tasks being the central issue or the lack of, combined with long deliveries. Several tasks still need to be finished for this reason, and I am trying to have complete systems at this time, so it is frustrating.

Leaving for a holiday but back to the electric string on my return