It was a week of consolidation and detailed work around the engine but at this time all the rigid and flexible lines are finished except the fuel lines too and from the pump but that is for a later time.
Click the image for the link |
The paint clearing will be done rain or no rain as I have the sign-writer booked for the 13th of April. Once done the planning for wing installation will be a higher priority. At this point moving into systems and away from construction.
Josh the Avionics man will be over for a week to finish checking the electrics and in particular the engine instruments trying to have that happen before the wings are fixed on